Hydro Initiative
|
|
|
|
- On 24th May, 2003, Hon’ble Prime Minister of India launched a scheme, formulated by Central Electricity Authority (CEA), for preparation of Preliminary Feasibility Report (PFRs) of 162 New Hydro Electric Schemes totaling to over 50,000 MW. All the PFRs were targeted to be completed by September, 2004.
- CEA was entrusted with the overall responsibility for the scheme.
- Preparation of PFRs involves conceptual planning, preparation of project and equipment layouts, infrastructure requirement, environmental and geological studies, power evacuation arrangement, cost estimates and economic evaluation.
- PFRs of all the 162 schemes have been prepared ahead of schedule. The schemes are located in 16 states as under :
|
Sl. No. |
State |
Number of Schemes |
Installed Capacity (MW) |
|
1 |
Andhra Pradesh |
1 |
81 |
|
2 |
Arunachal Pradesh |
42 |
27293 |
|
3 |
Chhattisgarh |
5 |
848 |
|
4 |
Himachal Pradesh |
15 |
3328 |
|
5 |
Jammu & Kashmir |
13 |
2675 |
|
6 |
Karnataka |
5 |
1900 |
|
7 |
Kerala |
2 |
126 |
|
8 |
Madhya Pradesh |
3 |
205 |
|
9 |
Maharashtra |
9 |
411 |
|
10 |
Manipur |
3 |
362 |
|
11 |
Meghalaya |
11 |
931 |
|
12 |
Mizoram |
3 |
1500 |
|
13 |
Nagaland |
3 |
330 |
|
14 |
Orissa |
4 |
1189 |
|
15 |
Sikkim |
10 |
1469 |
|
16 |
Uttaranchal |
33 |
5282 |
|
Total |
|
162 |
47930 |
- Preparation of DPRs for Low Tariff Schemes
|
Sl. No. |
Particulars |
Number |
IC (MW) |
|
1 |
Total PFRs |
162 |
47930 |
|
2 |
PFRs with Tariff upto Rs. 2.50 per unit |
78 |
34020 |
|
3 |
International Issue/Wild Life/Others |
05 |
1084 |
|
4 |
DPRs to be Prepared |
73 |
32936 | |
|
|
|
|