NHPC Limited (Formerly known as National Hydroelectric Power
Corporation Limited)
is committed to serve the nation by developing
hydro-power projects throughout the country in general
and in Himachal Pradesh in particular. Himachal Pradesh
has vast hydroelectric potential of 11647 MW at 60% load
factor as assessed by Central Electricity Authority (CEA).
NHPC Limited is surging ahead in developing hydro power in
Himachal Pradesh, thereby changing the socio-economic
conditions and augmenting overall development of the
region. NHPC Limited has already commissioned three projects,
viz. Baira Siul (180 MW), Chamera Stage – I (540 MW) and
Chamera Stage – II (300 MW). Three more projects, viz. Parbati Stage – II (800 MW), Parbati Stage – III (520
MW) and Chamera Stage – III (231 MW) are under active
construction stage. |